Key Takeaways
- Time in Status, Cycle Time & Lead Time Reports (Rovo AI) is a Jira Cloud app that measures Time in Status, Cycle Time, Lead Time, Throughput, Work Type Distribution, and System Stability for any project.
- A built-in Rovo AI agent reads the flow metrics and surfaces bottlenecks and trends in plain language, instead of leaving teams to interpret charts.
- Reports work out of the box with no workflow setup, and can be refined with JQL and exported to CSV.
- Metrics appear both as board-level reports and as configurable Jira dashboard gadgets.
- The app runs on Atlassian Forge (Runs on Atlassian) and is Cloud Fortified, so Jira data is processed inside your own Atlassian tenant and is not copied to Divim.
Common questions about Time in Status, Cycle Time & Lead Time Reports – Rovo AI, Divim’s Jira Cloud flow-metrics reporting app. For more on Jira flow metrics, see our Time in Status, Cycle Time & Throughput resource page.
What is the Time in Status & Cycle Time app?
It’s a Jira Cloud reporting app that measures Time in Status, Cycle Time, Lead Time, Throughput, Work Type Distribution, and System Stability for any Jira project. Reports are available as board reports and configurable dashboard gadgets, and Rovo AI provides instant analysis of where work is getting stuck, with no setup required.
Which flow metrics does it report?
It covers the core delivery metrics teams use to find and fix bottlenecks: Time in Status (how long issues sit in each status), Cycle Time, Lead Time, Throughput, Work Type Distribution, and System Stability. Each can be visualized as charts and read at the board or dashboard level.
How does the Rovo AI analysis help?
Rovo AI reads your flow metrics and surfaces bottlenecks and trends in plain language, so instead of staring at charts you get an instant, AI-generated read on where your workflow is slowing down and what’s driving it.
Does it require configuration or workflow setup?
No setup is required to get started, reports work out of the box for any project. You can refine results with JQL and configure dashboard gadgets to focus on specific projects, boards, or time ranges.
Can I export the data?
Yes. Reports support CSV export, so you can pull the underlying numbers into spreadsheets or share them with stakeholders outside Jira.
Where do the reports appear?
Metrics are available both as board-level reports and as configurable Jira dashboard gadgets, so individuals and teams can keep the views that matter to them on their own dashboards.
Is my data secure, and where is it stored?
The app is built on Atlassian Forge (Runs on Atlassian) and is Cloud Fortified. Your Jira data is processed inside your own Atlassian tenant and is not copied to Divim-operated servers. It inherits Atlassian’s hosting, encryption, and tenant-isolation posture.
What do I need to install it, and how do I get started?
You need a Jira Cloud site. Install from the Atlassian Marketplace and open a report on any project or add a gadget to a dashboard, reports populate immediately from your existing Jira history.
How much does it cost, is there a free trial?
Yes, there’s a free trial through the Atlassian Marketplace, and it’s free for small teams under Atlassian’s standard small-team pricing. Beyond that it’s a paid Marketplace app billed through your Atlassian account. Check current pricing on the Marketplace listing.
How do I get support?
Reach the team through the Divim support portal, or email support@divim.io.
Built by Divim, an Atlassian Marketplace Partner since 2018. View the app on the Atlassian Marketplace.



